About Us

Florence

Charleston

Gaston

Aiken

Greenville

Asheville

About Foremost

Foremost Construction has over 50 years of expertise in steel gas transmission pipelines and HDPE/poly gas distribution pipelines for municipalities and subdivisions including directional drilling. We are also experts at underground electrical installations. We can install up to 54” HDPE/poly pipe as well as welded steel pipe. We do concrete work, and we even have an expert asphalt crew! We install more than 2,500 service connections, over 25 miles of gas mains and more than 3,500 electric service connections per year.

We are Foremost! We have the best crews out there for any underground work. And we are always looking for people to join our team. We WELCOME you to stop into one of our District Locations. Call ahead to make sure someone will be able to meet you there. Just call and let our people know you are interested in working for Foremost.

386 Frontage Road,

Gaston, SC 29053,

PH: 803.939.4832

1011 Reynolds Pond Rd,

Aiken, SC 29801,

PH: 803.939.4832

1835 Trade St,

Florence, SC 29501,

PH: 843.317.6670

16 Casa Bianca Drive,

Charleston, SC 29407,

PH: 803.939.4832

201 Sentell Rd,

Greenville, SC 29611,

PH: 864.269.2332

81 Old Johnson Farm Rd,

Fletcher, NC 28732,

PH: 864.269.2332

Timeline of the History of Foremost

Over the past 40 years, we have grown extensively and continue to invest in our employees, their safety and the potential to identify new and innovative ways to accomplish our clients’ goals. The following timeline highlights some of the major events in the history of Sunland Construction, Inc.

1965

Started by T.A. (Thomas Alvin) Fore. He was a Marine and a welder and he started working for the local gas company doing underground work with just a backhoe and some help from friends.

1965 - 1980's

Success through high quality and integrity work brings more work. Foremost must add more crews throughout South Carolina. It was an important time as some small towns were just getting gas lines for the first time ever!

1980 - 1988

Important time for Foremost because the local gas company was going full throttle to replace rusting bare steel gas mains as well as some older technology polyethylene pipes. Foremost again grew in number of crews and people.

1988 - 1990

After that “replacement boom time” work slowed for a couple of years and Foremost went through a shrinking period. Leadership wasn’t happy about that after all the success, so they vowed to earn sustainable growth with the gas companies.

1990 - 1997

During this time period, Foremost learned to do “bid work” for both the local gas company and other small gas companies throughout SC, NC, and GA cementing an even stronger reputation with customers for Quality, Integrity and Perseverance all while working Safe and like a Family with them.

1997

Based on reputation, Foremost was honored with a very large growth spurt with customers, expanding its territory throughout most of SC and quadrupling the number of daily work crews!

1997 - 2000

Continued growth both inside our blanket contract but also several bid projects.

2000

Foremost was doing so well that Mr. John “Eddie” Soileau from Sunland Construction decided to buy Foremost. Mr. Eddie has a reputation for running a great mainline pipeline construction business and wanted to add distribution (municipality) gas construction work to Sunland. Mr. Eddie also has a reputation that if he buys something he doesn’t mess with it, so Foremost kept our name and identity but we adopted Sunland Logo.

2002

During this year Foremost made an important decision to start what we call “joint trench work” which means we install both gas and electric in the same ditch for our customers.

2002 - 2006

While continuing our gas only installations where we started, we were now doing bid work and joint trench work throughout SC, NC, GA, VA, and FL.

2006

Because of growth, Foremost needed a better headquarters location with a good sized yard and shops. This is the year we moved all that to Gaston, SC.

2009

We expanded our footprint by purchasing a local contractor upstate and that opened the door to begin working for another gas company. Once again, we added more crews.

2014

Once again, success gets you work and Foremost received a blanket contract with a gas company in North Carolina. This meant hiring 10-12 crews installing gas lines.

2015

Foremost celebrates its 50th anniversary.

2020

Foremost acquires an HDD (horizontal directional drilling) contractor with 4 small to medium rigs.

2022

Foremost currently has 210 employees working on 65 crews in SC and NC.